April 13, 2020

USS Gravely (DDG-107) Drydocking

As of April 2020, Marcom has completed all the preservation work associated with the drydocking of the USS GRAVELY (DDG-107) at NASSCO.

 The work performed included the Underwater Hull, Freeboard and the Tanks and Mast, totaling well over 100,000 square feet.  It was a successful Docking Availability, and we look forward to completing the topside preservation at the pier.

Quick Links

For Employees

Get in Touch

  • (757) 963-1851
  • (757) 963-1862
  • 620 Lincoln St.
    Portsmouth, VA 23704
  • Mon-Fri 7am-4pm
© MARCOM Services