May 23, 2018

Ex-USS McKee

In May 2018, Marcom successfully completed preservation of the Freeboard of the ex-USS McKee in Drydock #8 at the Norfolk Naval Shipyard.

A total of 60,000 square feet was blasted using a combination of ultra-high pressure (UHP) water-jetting lances and robotic crawlers. The vessel was coated with an epoxy primer system and a polysiloxane topcoat. Work was completed safely, ahead of schedule, and under budget.

Read our customer’s feedback on this project.

Quick Links

For Employees

Get in Touch

  • (757) 963-1851
  • (757) 963-1862
  • 620 Lincoln St.
    Portsmouth, VA 23704
  • Mon-Fri 7am-4pm
© MARCOM Services