USS Gravely (DDG-107) Drydocking
As of April 2020, Marcom has completed all the preservation work associated with the drydocking of the USS GRAVELY (DDG-107) at NASSCO.
The work performed included the Underwater Hull, Freeboard and the Tanks and Mast, totaling well over 100,000 square feet. It was a successful Docking Availability, and we look forward to completing the topside preservation at the pier.